Levelogger Field Notes

Tip:

It is recommended to take a manual water level measurement before installing a Levelogger, shortly after installation, periodically during your monitoring interval, and at the end of your measurement period. Use these measurement to verify Levelogger readings, and for data adjustments later on. Ensure you take manual readings as close in time as possible to a scheduled Levelogger readings.

Before Deployment

Before deployment, make sure you do the following:

Note:

If you are using an old style Direct Read Cable with a Levelogger 5 Series datalogger, you will need to use an L5–Edge DRC Adaptor.

solinst levelogger wireline or kevlar cord deployment

Wireline/Cord
Deployment

solinst levelogger direct read cable deployment

Direct Read
Deployment

 

Deployment

After Deployment:

After deployment, make sure you do the following:

 

Well Caps:

solinst levelogger well capssolinst levelogger direct read cable installed on well hanger bracketThe Model 3001 2" (or 4" with Adaptor) Well Cap Assembly provides a secure method of installing your Levelogger using wireline/Kevlar cord or L5 Direct Read Cables. A Support Hanger Bracket is available for supporting and organizing down well wires or cords, or for coiling extra L5 Direct Read Cable lengths.