Installation at 700 ft. |
||
![]() Four Waterloo Systems were installed to monitor a chlorinated compound release. Systems were installed at depths ranging from 430 ft - 750 ft, with most monitoring 7 zones. The Ports were constructed with both Double Valve Pumps and Vibrating |
![]() Contaminant investigation at a U.S. Air Force Base. Waterloo Systems installed to 700 ft. in overburden using screened and cased wells. Up to 6 zones per hole with dedicated pumps and transducers. |
|
![]() An investigation of hydraulic properties beneath a large waste site. Waterloo Multilevel Systems were chosen to allow water quality sampling and to help determine the zones of highest permeability within the aquifer. |
![]() Five Waterloo Systems were installed to 33.5 m (110 ft) in fractured bedrock to help characterize a historical chlorobenzene plume at the site of a proposed groundwater pump and treat site. Vibrating Wire Transducers and Double Valve Pumps were dedicated at each of the 4 monitoring zones. |